Sir Ganttalot discusses and de-mystifies the concept of “Task Types” in Microsoft Project, explaining the meaning of “Fixed Work”, “Fixed Duration”, “Fixed Units” and Effort Driven” tasks. Sir Ganttalot is sponsored by Westall Murray International, Inc. www.westallmurray.com and by proepm, Inc., www.epmhost.net.
Microsoft Project – Task Types (Fixed Work, Units, Duration)
About admin
Subscribe
Related Posts:
- Microsoft Project 2010 Video Training Tutorial – The Workspace — Part 2
- Microsoft Project 2010 Video Training Tutorial – The Workspace — Part 1
- Microsoft Project 2010 Video Training Tutorial – Creating a Project
- Microsoft Project 2010 Video Training Tutorial – Tracking Costs
- Microsoft Project 2010 Video Training Tutorial – Outline Codes and Work Breakdown Structure
Leave a Reply Click here to cancel reply.
Categories
- Andra bank IFSC codes (1)
- Astrology (2)
- Baba Ramdev (31)
- Bangalore bank IFSC codes (861)
- Bank IFSC code (23250)
- Black jack (361)
- cafe world (88)
- cake recipes (107)
- Cars (16)
- chirstmas (1531)
- Contests (4)
- Diwali Deepavali Recipes (1)
- dragon wars (497)
- Facebook games (10247)
- farmville (3726)
- Fashion Wars (622)
- Featured (8)
- Festival Recipes (12)
- fishville (36)
- Free ebooks (4)
- Games (7380)
- Ganesh Chaturthi (11)
- Google Plus Games (66)
- Google+ (2040)
- hairstyles (2)
- Health (50)
- Life In Bangalore (4276)
- Mafia war (2065)
- Mobiles (349)
- Movies (42)
- new year 2010 (237)
- News (18)
- Non Veg (16)
- petville (563)
- Pirates (5750)
- PMP (2497)
- PMP study guide and tips (2)
- Ramzan Recipes (24)
- Recipes (16)
- Roller Coaster (666)
- shewag (1)
- SMS (19)
- Special Forces (125)
- Street Racing (135)
- Technology (4282)
- Travalogue (2)
- vampire wars (400)
- Veg Recipes (9)
- zynga poker (1712)
© 2012 All out Bangalore. All Rights Reserved.
Powered by WordPress. Designed by ![]()

No comments yet.